Isis
by EVM Synths
Show more
No website
System :
Win32
Format :
VST
Isis is a multiwave synthesizer.
- 2 Oscillators with 64 Waves each.
- Keyboard control of oscillator waves can put a different waveform under each key.
- Use your MIDI keyboard to dynamically switch oscillator waves AS YOU PLAY.
- 10 note Polyphonic.
Downloads
Win 32 VST
(0.8 Mb)
V1.0
Phil
(5/5)
Oct 13 2021
Really great sound quality, I highly recommend this synth.
gridsleep
(5/5)
Jan 25 2019
A dual wavetable synth with surprising sound. Play with it and listen to the sounds evolve over time. There is much more here and much deeper than appearance. Isis was a major Egyptian god.
A7]1[
(4/5)
Oct 21 2018
A limited VST, but fun to have in the collection because of its name. This VST has good meme potential :)
Redeen
(3/5)
Jul 09 2017
Comes with poly 16 presets, most of which are wide shimmery sweeps, so it could reasonably be filed with pad plugins. Three "ARP Fun" presets have a more punchy attack and if used on an arpeggio (played by hand), morph over time. This synth is a bit limited, but could fill a niche. Several EVM demos are on YouTube - good way to get a quick overview of this trove of freebies.
C-H
(3/5)
Mar 05 2017
Unfortunate name but fun VSTi.
John
(5/5)
Feb 28 2017
Simple and very good! I love it :D