Neutron
by EVM Synths
Show more
No website
System :
Win32
Format :
VST
EVM Neutron is a bass synthesizer.
It can produce some deep and cutting edge bass sounds. Two main oscillators and 1 Sub oscillator combine to cut right through the mix. The sub frequency driver enhances the lower octave (watch your speakers). Low CPU in Mono mode.
It can produce some deep and cutting edge bass sounds. Two main oscillators and 1 Sub oscillator combine to cut right through the mix. The sub frequency driver enhances the lower octave (watch your speakers). Low CPU in Mono mode.
Downloads
Win 32 VST
(0.6 Mb)
V1.0